Staten Island's Local Law 37 filing window for Cycle 3 runs January 1 to December 31, 2026. Owners of walls 10 feet or taller fronting a public right-of-way must have a Qualified Retaining Wall Inspector inspect the wall and file the TR16 report by December 31, 2026. Late filing adds $1,000 a month starting January 1, 2027.
- Staten Island Cycle 3 window: January 1 – December 31, 2026 (1 RCNY §103-09; DOB service notice, Oct 2024).
- The TR16 report is due within 60 days of the inspection (Admin Code §28-305.4.4).
- Late filing: $1,000 a month from the day after the window closes; failure to file: $5,000 a year (rule effective Mar 23, 2025).
- DOB issued 147 failure-to-file retaining wall violations on Staten Island for the Cycle 1 deadline (NYC Open Data, code RWNRF).
NYC Retaining Walls is a licensed and insured retaining wall contractor that repairs walls to the findings of Local Law 37 reports and can connect owners with an independent inspector. The Staten Island retaining wall inspection deadline for Cycle 3 is December 31, 2026 — the borough’s one-year filing window opened January 1. As of mid-October, that leaves about ten weeks to hire a Qualified Retaining Wall Inspector (QRWI), get the wall inspected and file the TR16 report. Our Staten Island page covers the island’s walls and terrain; this guide covers the clock.
Does the deadline apply to my wall?
It applies if any part of the wall is 10 feet or taller, measured from the ground in front to the top including any parapet or fence, and the wall fronts a public right-of-way — a street, sidewalk, alley, public driveway or railroad, including the Staten Island Railway. On Staten Island these walls cluster on the North Shore and mid-island hills: see Grymes Hill and Todt Hill. DOB’s Building Information System flags covered properties on the property profile. The full rules are in the Local Law 37 guide.
What should you do in the weeks left?
- This week: confirm coverage and find a QRWI. Check the BIS flag, then contact inspectors from DOB’s QRWI list. Only a New York State-licensed PE with three years of retaining-wall experience can sign; an architect can’t.
- Gather what you have. Original drawings, a recent signed and sealed survey, and any earlier TR16 reports. Without drawings, the inspector needs probes, cores or test pits and a cross-section, which takes longer.
- Get the inspection on the calendar early. The report is due within 60 days of the inspection, but the late penalty is tied to the window closing. Aim to file before December 31.
- Coordinate with neighbors on a shared wall. One QRWI can cover a continuous wall shared by several owners; each owner pays the $355 filing fee.
- Line up repairs. If the wall is rated SREM or Unsafe, the repair clock starts with the report.
What does missing the deadline cost?
| Situation | Penalty (1 RCNY §103-09, effective Mar 23, 2025) |
|---|---|
| Report filed after December 31, 2026 | $1,000 per month, starting the day after the window closes |
| No report filed at all | $5,000 per year |
| Unsafe condition not corrected | $1,000 per month, prorated daily |
| SREM not corrected, later rated Unsafe | $2,000 one-time |
DOB’s web page still shows the older amounts ($250 a month, $1,000 a year); the rule text controls. Enforcement is real: NYC Open Data lists 147 failure-to-file retaining wall violations on Staten Island for the Cycle 1 deadline of December 31, 2018. If you already hold one, see the failure-to-file guide.
What if the wall isn’t yours?
Then you need proof, not a phone call. DOB’s FAQ says an owner who believes a wall belongs to a neighbor, the city or a railroad should submit a recent signed and sealed survey from a licensed land surveyor with form RWIP-11; DOB doesn’t keep private surveys. If the survey puts the wall on the common lot line, both owners are jointly responsible, half each (Admin Code §28-305.1.1), and one QRWI can cover both. See the neighbors guide and shared retaining wall repair. Start the survey now — it can take longer than the inspection.
What happens after the report is filed?
That depends on the rating. Safe and Safe with minor repairs mean you’re done until 2031, apart from the minor items. SREM means repairs or engineering monitoring within no more than a year, and the same condition can’t be rated SREM in the next cycle — see the SREM guide. Unsafe means the inspector calls 311 immediately, the area must be protected, and the condition must be corrected within 90 days, with an amended report ($130) after the repair. Retaining wall violation repair covers that work.
What will the inspection cost?
No QRWI fee is published, and we won’t invent one. The quote depends on the wall’s length and height, access, whether drawings exist and how many owners share it; the inspection cost guide lays out each driver. Our retaining wall inspection page explains how we connect Staten Island owners with an independent inspector and handle the repairs the report calls for.
With the Staten Island window closing December 31, 2026, book a QRWI this week, get the inspection done early enough to file before year-end, and line up any repairs the report calls for. For help finding an independent inspector and fixing what they find, (718) 555-0100.
Frequently asked questions.
What if my inspector can't come until December?
Book the date and keep the report moving. The report must be filed within 60 days of the inspection, but the late-filing penalty under 1 RCNY §103-09 starts the day after the borough's window closes. Don't assume the 60-day clock carries you past December 31 — ask your QRWI to schedule the inspection early enough to file in 2026, and get the timing in writing.
My wall was rated Unsafe. Does the deadline change?
The filing deadline doesn't, but a new clock starts. The inspector must notify you and DOB immediately, by calling 311, and you must protect the public right away. Under the rule, an Unsafe condition must be corrected within 90 days of filing the report, with an extension available for $260 if you apply with a repair contract. An amended report follows the repair.
When is the next Staten Island window after 2026?
Windows repeat every fifth year, so the next Staten Island window, Cycle 4, is 2031. Queens files in 2027 and Brooklyn in 2028 to finish Cycle 3. A new wall's first report is due five years after its first work permit if that falls in the borough's window; otherwise it's due in the following window.